01 — Field survey method
Each visit produces one page of measured facts, written before any opinion and dated on the day. Items we could not confirm are listed in the same dossier, not omitted.
Surface type, clear width at the narrowest point, and grade on the final ascent.
Source type, depth or yield, and whether the well is drawn by a neighbouring plot.
Phase count at the meter, distance to the nearest transformer, and the last outage note from the owner.
Stakes walked end to end, fence condition, and any overlap with the parcel next door.
Measured along the road, not as the crow flies, from the gate to the nearest facilities.
Want a survey run on a specific plot? Send the brief.
03 — Entry anatomy
One entry, opened up. UA-0417 covers a 1.4 ha plot in Poltava oblast, visited on site. Items we could not confirm are listed in the same dossier, not omitted.
UA-0417 · Poltava oblast · 1.4 ha
UA-0417
Fixed row order, never re-sorted
| 01 Land area | 1.4 ha |
|---|---|
| 02 Build year | 1998, roof replaced 2021 |
| 03 Water source | Borehole, 42 m, pump house |
| 04 Power connection | 3-phase, 380 V, 15 kW allocated |
| 05 Access road | Crushed stone, 1.2 km to paved junction |
| 06 Hospital | 18 km, Poltava |
| 07 Rail | 6 km, 4 daily services |
The list runs from what a surveyor can measure to what a buyer must check in person. Land area and build year sit first because they are stable; access road and rail distance sit last because they change with road works and timetable revisions. Keeping the same seven positions across every entry means two dossiers can be read side by side without re-learning the layout.
Unconfirmed fields are not deleted. They stay in position and carry a plain note, so a gap is visible rather than silent. Read what the survey does not cover.
04 Limits of the register
A register entry records what one adviser saw, measured and asked about on one visit. It is a description, not an approval. Anything we could not confirm is written into the same dossier next to the confirmed items, rather than left out.
If a decision needs a document we do not produce, we say so at the brief stage. See what a full entry contains in the entry anatomy, or send the question with your brief on the contact page.
06 — Request a selection brief
One brief, one dossier per property: land area, build year, water source, power connection, access road type. Items we could not confirm are listed in the same dossier, not omitted.